Sample form
You are viewing this form in reference mode and the form data can not be saved.

Complete the table below for all modes of mechanical cooling and refrigeration equipment with 0.5 lb (225 g) or more of refrigerant serving the project. Multiple pieces of the same equipment must only be recorded in the table once.

HVAC&R
Equipment Type
Refrigerant Used1 Manufacturer Name Installation Date1
{{ row.equipmentType == 'Other' ?row.equipmentTypeOther :row.equipmentType }}
{{ (row.refrigerantUsed == 'Other') ?row.refrigerantUsedOther :row.refrigerantUsed }}
{{ row.manufacturer }}
{{ row.instalDate }}

Notes:
1 Projects that install new HVAC&R equipment that use CFC-based refrigerants or HCFC-based refrigerants are ineligible for prerequisite compliance.

Upload the CFC and/or HCFC phase-out conversion plan(s) (or summary) for all existing mechanical cooling equipment. Highlight language indicating specific equipment using CFC-based refrigerants and/or HCFC-based refrigerants and expected phase-out dates. Include leakage rates and refrigerant quantities. Phase-out must be complete prior to project completion.

If applicable, describe the reason(s) why the CFC and/or HCFC phase-out will not be completed prior to project completion. If not applicable, enter "N/A" below.

Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits. (Optional)

Upload any additional documentation that supports the claim to special circumstances. (Optional)